Rishikesh-Karnaprayag Tunnel T-8

03.05.2025

 

Rishikesh-Karnaprayag Tunnel T-8

 

For Prelims: About Rishikesh-Karnaprayag Tunnel T-8

 

Why in the news?   

Tunnel No. 8 (T-8) is set to become India’s longest rail transportation tunnel at 14.57 km, surpassing the current longest T-50 (12.77 km) on the Udhampur-Srinagar-Baramulla Railway Link.

 

About Rishikesh-Karnaprayag Tunnel T-8

  • T-8 is a twin tunnel situated on the Devprayag–Janasu stretch of the 125-km Rishikesh–Karnaprayag Broad Gauge Rail Link Project, in the state of Uttarakhand.
  • The project is being implemented by Rail Vikas Nigam Limited (RVNL), a Navratna PSU under the Ministry of Railways, and executed by Larsen & Toubro (L&T).
  • Over 83% of the 125-km alignment—about 104 km—comprises tunnels, making it one of the most underground-intensive rail projects in India.
  • The rail line will connect Rishikesh to Karnaprayag, cutting travel time from 7 hours to just 2 hours, enhancing connectivity across five districts: Dehradun, Tehri Garhwal, Pauri Garhwal, Rudraprayag and Chamoli.

Engineering and Technological Highlights

  • Tunnel Boring Machines (TBMs) were used for the first time in Himalayan rail projects to excavate 4 km of T-8. These 2200-tonne machines were imported from Germany, transported via 17 shipments and assembled on site.
  • The diameter of the TBM used for T-8 was 1 metres, larger than the 6-metre TBMs used in the Delhi Metro.
  • The New Austrian Tunnelling Method (NATM) was used to excavate the remaining 4.11 km of the tunnel, especially in non-uniform geological zones.
  • Three advanced technologies were deployed for safety and precision:
    • Tunnel Seismic Prediction (TSP) to detect geological faults.
    • Torque Box for multidirectional boring capability.
    • Void Measurement to detect and fill gaps behind tunnel linings.

                               Source: Indian Express

 

Consider the following statements regarding Rishikesh-Karnaprayag Tunnel T-8:

1. The project is being implemented by Rail Vikas Nigam Limited (RVNL).

2. The rail line will connect Rishikesh to Karnaprayag.

 

Which of the statements given above is/are correct?

A.1 only

B.2 only

C.Both 1 and 2

D.Neither 1 nor 2

 

Answer C